Case studies

US consumer goods manufacturer

Standardizing Support Staffing Across 30 Manufacturing Plants

A manufacturer built through acquisitions staffed each plant differently, and no one could say which headcount was right. A complexity-based staffing standard for 30 plants, announced across eight business units in one day, designed more than $11M a year in labour savings into a $120M support labour base.

  • $11M+a year in labour savings designed in
  • 30plants standardized
  • $120Mcost base redesigned

Industry

US consumer goods manufacturing

Engagement

Staffing standard design and rollout across 30 plants, about seven months

Operating Model and WorkforceCost and Margin
  1. The challenge

    Each acquisition brought its own plants and its own way of running them, and each business unit leader believed their plants had to look different because they made different products. Staffing drifted apart: two plants doing the same work could carry very different headcounts.

  2. The work

    The products differed, but much of the support work was the same. All 30 plants were benchmarked and grouped by the work they do. Each was scored for complexity on the processes it runs, its mix of products, its machines, and rules such as food safety. Each complexity level got its own staffing ratio for every support role, which set how many people each plant needed. The recommendations covered which plants to resize and how that fit reporting lines and the org chart. A side workstream set out what more automation would mean for the plants, ending in a workshop for plant leaders on a working demo factory floor. Leaders pushed back hard, so the rollout was planned in detail: who hears what, when and in what order.

  3. Results

    • $11M+a year in labour savings designed in, about $8M after funding new roles
    • 30plants standardized
    • $120Mcost base redesigned
  4. What stayed in place

    The company announced the new design across eight business units on one day, with one unit left as it was. A month later, 85% of plant and unit leaders said the changes would help.

Not sure where your profit goes? Let's find out.

30 minutes with Usama. You'll leave knowing where to look first.

No obligation. We'll see together whether we're a fit.