SpotlightUS consumer goods manufacturer
Improving Plant Throughput Through Floor-Level Diagnostics
A consumer goods manufacturer had strong sales and falling profit. A plant-by-plant assessment found 57 to 94% more capacity in the existing lines, worth more than $60M a year in margin. Much of the loss sat in habits no report recorded, and once the plant teams saw it in their own data, output rose 30% within two weeks.
- $60M+a year in margin found
- Up to 94% more capacity
- 30%output improvement in 2 weeks
Industry
US consumer goods manufacturing
Engagement
Plant-by-plant throughput and margin assessment, about eight weeks
The challenge
Sales were strong, but margin kept falling. Plant reports showed lines running close to plan, and no one could say where capacity was being lost. The plants ranged from six large lines to more than 40, with 50 to 150 people each, and much of how they ran lived in people's heads rather than in any system.
The work
A view before the plant floorEach plant's data was analysed before any visit, against a benchmark of where losses usually sit, so every visit started with a view of how well that plant's equipment was really running and a list of what to test.Read more
Each visit then toured every line and asset.
Plant managers picked the numbers apartThe findings were played back to each plant manager, who was asked to find what was wrong with them.Read more
Managers who had not seen the losses proposed where to look next, and more surfaced: waste that was never recorded, changeovers running long, a powder pouch filling line losing product because maintenance was skipped, and a packing line whose counter showed 100 boxes a minute against 20 counted by hand. The plant fixed that line within a day of the visit, and its output rose 12%.
What the schedulers knew, tested against the dataOne plant manager was certain the production schedule followed best practice.Read more
It was set from the schedulers' experience and never frozen for a fixed period, so it changed week to week. Getting the scheduling and changeover records took persistence. Once they were in, 66% of the plant's changeovers turned out to be repeats that a schedule frozen for three weeks would have avoided, and they were among the biggest drags on its output. The plant manager and the schedulers recognised the pattern in their own records. Cutting those repeats alone frees 3,500 to 6,500 machine hours a year. Cutting how long each remaining changeover takes as well brings $2M to $3M a year in labour savings and 9.5M to 15M more cases of output a year, at that one plant.
Proof on the lineThe people running the lines assumed outsiders were there to cut jobs, and their answer to every finding was "prove it".Read more
So each finding was tested on the line with the people who ran it, until they could see the gap for themselves.
Sized and sequencedEvery line's losses were sorted into planned stops, breakdowns and changeovers, slow running, and waste and quality, and each fix was sized twice: its value in dollars and the capacity it freed.Read more
The fixes were then ordered so each gain set up the next, and so the plants could run lean enough to take the labour savings as well.


Results
- $60M+a year in margin found
- 94%Up to 94% more capacity
- 30%output improvement in two weeks
- 12%more output on one line, fixed within a day
What stayed in place
A written, sequenced plan for each fix, with a named owner, so work started the week the assessment ended.
More case studies
SpotlightFood-service packaging and supplies distributor
20 to 30% lower supplier costs
Integrating Core Operations to Cut Supplier Costs and Expand Warehouse Capacity
- 4.5x+ storage, same floor space
- Sales, costs and ops on one system in 3 months
DistributionOperations and ProductivityCost and Margin
Read the caseUS pharmacy chain
10%+ labour savings
Assessing Specialty Prescription Centralization and a New Pill-Pack Service
- 25%+ less cash in stock
- $30M+ in working capital
Healthcare and life sciencesOperations and ProductivityCost and Margin
Read the caseBiotech company preparing a US launch
EU to US gene therapy launch
Designing US Gene Therapy Distribution and Supply Chain Ownership
- -80°C cold chain designed
- 5 drugs, 5 regions, 1 model
Healthcare and life sciencesOperations and ProductivityOperating Model and Workforce
Read the case
Not sure where your profit goes? Let's find out.
30 minutes with Usama. You'll leave knowing where to look first.
No obligation. We'll see together whether we're a fit.